A.G. Gaston provided civil/site design and other services related to the new ductile iron pipe fabrication line at U.S. Pipe’s Bessemer mill. Our responsibilities included surveying, verification of as-built features and subsurface utilities, and all paving/drainage design. U.S. Pipe implemented a fast-track, multiple bid package approach to the mill expansion. We met their very aggressive schedule which allowed our early bid on the first major bid package.

Date

February 5, 2018

Client

U.S. Pipe

Category

Engineering