A.G. Gaston’s project commitments included a new chemical facility sized for 35.9 mgd, a new Dissolved Air Flotation (DAF) unit, a new 35.9 mgd residuals handling facility, and a new standby generator system. We provided a conceptual layout as well as civil/site design, design of construction entrances and temporary access/circulation roadways, and design of grading, drainage, sewers, pump station and process piping for the expansion.
Birmingham Water Works Board