Stay connected:   
  • SITEMAP
  • ENGLISH
    • DEUTSCH
    • ESPANOL
Open/Close Menu A.G. Gaston – Construction | Engineering | Consulting A.G. Gaston – Construction | Engineering | Consulting
 ...
Skip to content
  • HOME
  • OUR SERVICES
    • PROCUREMENT SERVICES
    • CONSTRUCTION SERVICES
    • ENGINEERING DESIGN
    • PRIVATE EQUITY INVESTMENTS
  • CASE STUDIES
  • CAREERS
  • OUR STORY
  • CONTACT US
 ...

Case Studies

A.G. Gaston Construction prides itself on meeting design and construction challenges with both creative and technical thinking. We are often faced situations that call for an out-of-the-box approach. Given our history of taking careful risks and successfully backing them up with our vast experience and expert touch, we’d like to share some details about just a few of our many standout projects.:

All
All Construction Consulting Engineering

This project’s centerpiece is a new 8,500-seat downtown

This 12-story, 74,000 sq. foot expansion is the very first new LEED Silver-certified

A.G. Gaston managed the complete renovation and expansion of the existing terminal as well as the construction

As part of Birmingham City Schools’ capital improvement project, the client requested end-to-end coverage from

A. G. Gaston provided all civil and site design for this multi-phase redevelopment of Birmingham’s

A.G. Gaston’s project commitments included a new chemical facility sized for 35.9 mgd, a new Dissolved Air Flotation

A.G. Gaston provided civil/site design and other services related to the new ductile iron pipe fabrication line at

A.G. Gaston designed the pavement and drainage, traffic control, and all other related street improvements to support

A. G. Gaston provided consulting services to support the City of Birmingham’s municipal storm water

A.G. Gaston provided the environmental permitting for the renewal of the national pollutant discharge elimination system

A. G. Gaston provided operations and management of a waste water treatment facility located in Bessemer, Alabama.

A. G. Gaston aimed to identify and characterize all available water supply for the Birmingham Water Works Board’s long-range development program.

footer-logo

  Our Services »

  Top

ABOUT

Our story began over three decades ago in 1984.

20th century visionary, Dr. Arthur George Gaston founded the company following a request from the Secretary of Housing and Urban Development(HUD) and the Housing Authority of the Birmingham District (HABD) to participate in a pilot program that sought to renovate many Birmingham, Alabama public housing properties.

The pilot program would make use of a work force of property residents who would also benefit from training in the construction industry.

READ OUR STORY

SERVICES

  • PROCUREMENT SERVICES →
  • CONSTRUCTION SERVICES →
  • ENGINEERING DESIGN →
  • PRIVATE EQUITY INVESTMENTS →

CONTACTS

Want to get in touch with us about your project? We’re here to help make your building vision a reality.

LET’S TALK

© 2018 A. G. Gaston | Two 20th Street North | Suite 150 | Birmingham, AL 35203-0697